First reported 2026-11-18 by TrendForce (2026 Roadshow Korea, Seoul)
TrendForce: HBM4E Opening Price Discussed at $5/GB vs HBM4's $2.05/GB
TrendForce told its '2026 Roadshow Korea' in Seoul on November 18 that HBM4 was priced at a minimum of $2.05 per GB this year, while HBM4E's initial selling price is being discussed at a minimum of $5 per GB — a roughly 144% per-GB step-up for the 7th-generation stack expected to enter mass production in 2H 2027. The same reporting notes NVIDIA is asking Samsung and SK hynix for a custom 'NVHBM' variant built on HBM4E with TSMC-made base dies, which is expected to price above standard HBM4E and further raise accelerator memory BOM.
If a $5/GB floor holds, HBM becomes the dominant and fastest-inflating line item in the Vera Rubin-class accelerator BOM, shifting pricing power decisively to memory vendors just as commodity DRAM is forecast to deflate in 2028. Buyers should assume custom NVHBM carries a further premium and lock LTA price ceilings now, since Samsung and SK hynix have already contracted the majority of 2027-2028 capacity.
Chips affected — model the economics
This signal touches these AI accelerators. Open any in the cost calculator, pre-filled with its full BOM.
Sources
- Businesspost — 중국 생산증가에 2028년 범용 D램값 19% 하락 전망, 삼성전자·SK하이닉스 수익성 HBM이 가른다
- Explainx — Samsung Memory Sold Out to 2029: AI LTA Squeeze
Related data & tools
Silicon Analysts Research
All benchmarks and data are derived from publicly available sources (earnings calls, press releases, analyst reports, regulatory filings). Figures are estimates for educational purposes only and should not be used as the sole basis for business or investment decisions. Public sources only — no insider data. Generated from the cited reports; verify against the originals before acting. Full Terms & Data Provenance