CriticalMemory·Confidence 82%·HBM4E initial contract price: $2.05/GB (HBM4, 2026) → minimum $5.00/GB (HBM4E, 2027), approximately +144% per GB; JP Morgan sees HBM undersupply of 20% (2026), 19% (2027), 16% (2028); Goldman Sachs cuts 2028 commodity DRAM outlook to -19% y/y and NAND to -21%.November 23, 2026

First reported 2026-11-18 by TrendForce (2026 Roadshow Korea, Seoul)

TrendForce: HBM4E Opening Price Discussed at $5/GB vs HBM4's $2.05/GB

TrendForce told its '2026 Roadshow Korea' in Seoul on November 18 that HBM4 was priced at a minimum of $2.05 per GB this year, while HBM4E's initial selling price is being discussed at a minimum of $5 per GB — a roughly 144% per-GB step-up for the 7th-generation stack expected to enter mass production in 2H 2027. The same reporting notes NVIDIA is asking Samsung and SK hynix for a custom 'NVHBM' variant built on HBM4E with TSMC-made base dies, which is expected to price above standard HBM4E and further raise accelerator memory BOM.

Analysis

If a $5/GB floor holds, HBM becomes the dominant and fastest-inflating line item in the Vera Rubin-class accelerator BOM, shifting pricing power decisively to memory vendors just as commodity DRAM is forecast to deflate in 2028. Buyers should assume custom NVHBM carries a further premium and lock LTA price ceilings now, since Samsung and SK hynix have already contracted the majority of 2027-2028 capacity.

Chips affected — model the economics

This signal touches these AI accelerators. Open any in the cost calculator, pre-filled with its full BOM.

Silicon Analysts Research

All benchmarks and data are derived from publicly available sources (earnings calls, press releases, analyst reports, regulatory filings). Figures are estimates for educational purposes only and should not be used as the sole basis for business or investment decisions. Public sources only — no insider data. Generated from the cited reports; verify against the originals before acting. Full Terms & Data Provenance

Silicon Analysts Weekly

Get the weekly supply-chain & pricing brief

HBM, wafer, and capacity movements each week — sourced and dated.

One short email a week — sourced and dated. No ads. One-click unsubscribe.