Semiconductor Capex by Company — Historical Time Series Data
Annual capital expenditure by leading semiconductor companies — TSMC, Samsung, Micron, SK Hynix, and Intel. A leading indicator of future capacity additions 12–18 months out.
Semiconductor Capex by Company — latest readings
20 data points across 4 series, covering 2020 to 2026E. Values below are free; the full point-level history is available with Pro.
| Series | Period | Latest ($B) | Change |
|---|---|---|---|
| TSMC | 2025 | 38 | +26.7% versus 2024 |
| Samsung | 2025E | 40 | +17.6% versus 2024 |
| Micron | 2025E | 14 | +75.0% versus 2024 |
| SK Hynix | 2025E | 22 | +25.7% versus 2024 |
Semiconductor Capex by Company
Annual capital expenditure by leading semiconductor companies — TSMC, Samsung, Micron, SK Hynix, and Intel. A leading indicator of future capacity additions 12–18 months out.
8 data point values hidden. Unlock exact values, sources, and exports with Pro.
Data Table
| Period | Series | Value |
|---|---|---|
2020 | TSMC | ••• |
2021 | TSMC | ••• |
2021 | Samsung | ••• |
2022 | TSMC | ••• |
2022 | Samsung | ••• |
2022 | Micron | ••• |
2022 | SK Hynix | ••• |
2023 | Samsung | 30.5 |
2023 | SK Hynix | 10 |
2023 | TSMC | 32.1 |
2023 | Micron | 7 |
2024 | SK Hynix | 17.5 |
2024 | Samsung | 34 |
2024 | Micron | 8 |
2024 | TSMC | 30 |
2025E | Samsung | 40 |
2025 | TSMC | 38 |
2025E | Micron | 14 |
2025E | SK Hynix | 22 |
2026EP | TSMC | ••• |
Methodology & Sources
Annual reports, quarterly earnings releases, and investor day presentations. Capex = PP&E additions as reported. Includes fab construction, equipment, and technology upgrades. All figures in USD billions.
Citations:
- TSMC 2020 Annual Report (Feb 2021)
- TSMC 2021 Annual Report (Feb 2022)
- Samsung 2021 Annual Report (Feb 2022)
- TSMC 2022 Annual Report (Feb 2023)
- Samsung 2022 Annual Report (Feb 2023)
- Micron FY2022 Annual Report (Oct 2022)
- SK Hynix 2022 Annual Report (Feb 2023)
- Samsung 2023 Annual Report (Feb 2024)
- SK Hynix 2023 Annual Report (Feb 2024)
- TSMC 2023 Annual Report (Feb 2024)
- Micron FY2023 Annual Report (Oct 2023)
- SK Hynix 2024 Annual Report (Jan 2025)
- Samsung 2024 Annual Report (Jan 2025)
- Micron FY2024 Annual Report (Oct 2024)
- TSMC Q4 2024 earnings (Jan 2025)
- Samsung investor day / analyst estimates (Jan 2026)
- TSMC Q4 2025 guidance (Jan 2026)
- Micron guidance + $100B NY megafab (Jan 2026)
- SK Hynix guidance 2025 (Jan 2026)
- Analyst consensus Jan 2026 (Jan 2026)
Related Tools
Related Analysis
Market intelligence on this data
All market intelligence →TSMC CoWoS Yield Confirmed at 98-99% in HVM; Nvidia Weighs 8-Stack HBM4E Fallback for Rubin Ultra
CoWoS yield: 98-99% confirmed in HVM (positive); HBM4E 12-stack yield risk flagged — potential stack-count reduction from 12 to 8 layers (est. HBM capacity-per-die reduction of ~33% if downgrade confirmed); TSMC 2026 CapEx raised to $60-64B record (capacity positive).
SK Hynix 54 Trillion Won CapEx Locked In; Nvidia Rubin Ultra Downgrading HBM Stack Amid Structural Supply Crunch
CapEx: +54 trillion KRW (~$39B) across Y2 and M17 fabs; HBM capacity additions: Y1 initial production February 2027, M17 December 2028, Y2 June 2029 (plus 12–18 months yield ramp each); Contract DRAM prices: +90–95% QoQ in Q1 2026 (largest single-quarter spike on record per TechTimes); Nvidia Rubin Ultra HBM stack: downgraded from 16-stack HBM4E to 12-stack or 8-stack variants under evaluation; Lam Research advanced packaging revenue outlook raised from >40% to >70% YoY growth in current fiscal year.
SK Hynix 54 Trillion Won CapEx Commit + Nvidia Rubin Ultra HBM Spec Cut Signal Dual-Sided HBM4E Supply Crunch
CapEx: +54 trillion KRW (~$39B USD) in new HBM fab capacity (Yongin Y2 + Cheongju M17); Rubin Ultra HBM spec under review: -75% to -81% vs. original 1TB target (192GB–256GB prototypes reported); HBM accounts for >50% of AI chip BOM per cited Korean press sourcing.
Nvidia Rubin Ultra HBM Spec Downgrade Under Review as HBM4/4E Supply Crunch Deepens Through 2027
Customer HBM4 fill rates at 60–70% of ordered volumes (Micron-confirmed); HBM4 BOM cost for GPU vendors estimated at ~2x HBM3E per Korean press citing industry sources; CoWoS lead times confirmed at 52+ weeks; ABF substrate orders extending into 2028.