Semiconductor Capex by Company — Historical Time Series Data

Annual capital expenditure by leading semiconductor companies — TSMC, Samsung, Micron, SK Hynix, and Intel. A leading indicator of future capacity additions 12–18 months out.

Semiconductor Capex by Company — latest readings

20 data points across 4 series, covering 2020 to 2026E. Values below are free; the full point-level history is available with Pro.

Latest freely available reading for each series in Semiconductor Capex by Company
SeriesPeriodLatest ($B)Change
TSMC202538+26.7% versus 2024
Samsung2025E40+17.6% versus 2024
Micron2025E14+75.0% versus 2024
SK Hynix2025E22+25.7% versus 2024

Semiconductor Capex by Company

Annual capital expenditure by leading semiconductor companies — TSMC, Samsung, Micron, SK Hynix, and Intel. A leading indicator of future capacity additions 12–18 months out.

20 data points·Unit: $B·Last updated: Jan 2026

Historical data blurred — unlock Pro for exact values across 8 data points
Projection / forecast

8 data point values hidden. Unlock exact values, sources, and exports with Pro.

Unlock Pro

Data Table

PeriodSeriesValue
2020
TSMC
•••
2021
TSMC
•••
2021
Samsung
•••
2022
TSMC
•••
2022
Samsung
•••
2022
Micron
•••
2022
SK Hynix
•••
2023
Samsung
30.5
2023
SK Hynix
10
2023
TSMC
32.1
2023
Micron
7
2024
SK Hynix
17.5
2024
Samsung
34
2024
Micron
8
2024
TSMC
30
2025E
Samsung
40
2025
TSMC
38
2025E
Micron
14
2025E
SK Hynix
22
2026EP
TSMC
•••

Methodology & Sources

Annual reports, quarterly earnings releases, and investor day presentations. Capex = PP&E additions as reported. Includes fab construction, equipment, and technology upgrades. All figures in USD billions.

Citations:

  • TSMC 2020 Annual Report (Feb 2021)
  • TSMC 2021 Annual Report (Feb 2022)
  • Samsung 2021 Annual Report (Feb 2022)
  • TSMC 2022 Annual Report (Feb 2023)
  • Samsung 2022 Annual Report (Feb 2023)
  • Micron FY2022 Annual Report (Oct 2022)
  • SK Hynix 2022 Annual Report (Feb 2023)
  • Samsung 2023 Annual Report (Feb 2024)
  • SK Hynix 2023 Annual Report (Feb 2024)
  • TSMC 2023 Annual Report (Feb 2024)
  • Micron FY2023 Annual Report (Oct 2023)
  • SK Hynix 2024 Annual Report (Jan 2025)
  • Samsung 2024 Annual Report (Jan 2025)
  • Micron FY2024 Annual Report (Oct 2024)
  • TSMC Q4 2024 earnings (Jan 2025)
  • Samsung investor day / analyst estimates (Jan 2026)
  • TSMC Q4 2025 guidance (Jan 2026)
  • Micron guidance + $100B NY megafab (Jan 2026)
  • SK Hynix guidance 2025 (Jan 2026)
  • Analyst consensus Jan 2026 (Jan 2026)

Related Tools

Related Analysis

Market intelligence on this data

All market intelligence →
HighPackagingAug 11, 2026

TSMC CoWoS Yield Confirmed at 98-99% in HVM; Nvidia Weighs 8-Stack HBM4E Fallback for Rubin Ultra

CoWoS yield: 98-99% confirmed in HVM (positive); HBM4E 12-stack yield risk flagged — potential stack-count reduction from 12 to 8 layers (est. HBM capacity-per-die reduction of ~33% if downgrade confirmed); TSMC 2026 CapEx raised to $60-64B record (capacity positive).

HighMemoryAug 8, 2026

SK Hynix 54 Trillion Won CapEx Locked In; Nvidia Rubin Ultra Downgrading HBM Stack Amid Structural Supply Crunch

CapEx: +54 trillion KRW (~$39B) across Y2 and M17 fabs; HBM capacity additions: Y1 initial production February 2027, M17 December 2028, Y2 June 2029 (plus 12–18 months yield ramp each); Contract DRAM prices: +90–95% QoQ in Q1 2026 (largest single-quarter spike on record per TechTimes); Nvidia Rubin Ultra HBM stack: downgraded from 16-stack HBM4E to 12-stack or 8-stack variants under evaluation; Lam Research advanced packaging revenue outlook raised from >40% to >70% YoY growth in current fiscal year.

HighMemoryAug 7, 2026

SK Hynix 54 Trillion Won CapEx Commit + Nvidia Rubin Ultra HBM Spec Cut Signal Dual-Sided HBM4E Supply Crunch

CapEx: +54 trillion KRW (~$39B USD) in new HBM fab capacity (Yongin Y2 + Cheongju M17); Rubin Ultra HBM spec under review: -75% to -81% vs. original 1TB target (192GB–256GB prototypes reported); HBM accounts for >50% of AI chip BOM per cited Korean press sourcing.

HighMemoryAug 6, 2026

Nvidia Rubin Ultra HBM Spec Downgrade Under Review as HBM4/4E Supply Crunch Deepens Through 2027

Customer HBM4 fill rates at 60–70% of ordered volumes (Micron-confirmed); HBM4 BOM cost for GPU vendors estimated at ~2x HBM3E per Korean press citing industry sources; CoWoS lead times confirmed at 52+ weeks; ABF substrate orders extending into 2028.