NAND Flash Pricing
Newest print Mar 2026Reviewed quarterlyCSV — newest observations; full series with a Pro keyAPI
NAND Flash Pricing — latest readings
12 observations across 2 series, Q1 2022–Q1 2026.
| Series | Latest ($/GB) | Source |
|---|---|---|
| Enterprise SSD (TLC)Q1 2026 | $0.18 | Our model estimateSilicon Analysts modelMar 2026 |
| Consumer SSD (TLC)Q1 2026 | $0.10 | Our model estimateSilicon Analysts modelMar 2026 |
NAND flash pricing for enterprise SSD (TLC) and consumer SSD (TLC/QLC), quarterly 2022-2026. Audit 2026-10-24: every $/GB level here is our unverified estimate - publisher NAND/SSD contract levels are subscriber-only and public releases give percentage changes.
Consumer SSD (TLC): $0.10/GB (Q1 2026), Silicon Analysts estimate (unverified), Mar 2026
2022–2024: 6 earlier prints — full ledger is Pro
- 1Q2 2023 — NAND Price Floor: Enterprise and consumer NAND prices hit cycle low. Production cuts announced by all major suppliers.
- 2Q1 2026 — AI Storage Crunch: Client SSD contract prices surge 40%+ as AI datacenter demand reallocates NAND supply away from consumer.
Source: Silicon Analysts model · Basis: contract · Anonymous view: the newest 3 observations per series (May 2023–Feb 2026); 6 earlier prints back to 2022 — full ledger is Pro.
Prints ledger
| Note and copy | |||||||
|---|---|---|---|---|---|---|---|
| Q1 2026 | Enterprise SSD (TLC)Our model estimate | $0.18$0.15–$0.22/GB | |||||
Source: Silicon Analysts estimate (unverified), Mar 2026 · Basis: contract · Estimate AI inference storage demand driving enterprise NAND tighter | Audit 2026-10-24: TrendForce / DRAMeXchange publish NAND and SSD contract levels to subscribers only and their public releases give percentage changes, so this level cannot be checked against the publisher it was credited to; served as our unverified estimate. The previous attribution is kept in the corrections trail. | |||||||
| Q1 2026 | Consumer SSD (TLC)Our model estimate | $0.10$0.08–$0.13/GB | |||||
Source: Silicon Analysts estimate (unverified), Mar 2026 · Basis: contract · Estimate 40%+ increase from AI capacity reallocation; PC OEMs struggling to source | Audit 2026-10-24: TrendForce / DRAMeXchange publish NAND and SSD contract levels to subscribers only and their public releases give percentage changes, so this level cannot be checked against the publisher it was credited to; served as our unverified estimate. The previous attribution is kept in the corrections trail. | |||||||
| Q1 2025 | Enterprise SSD (TLC)Our model estimate | $0.15 | |||||
Source: Silicon Analysts estimate (unverified), Jan 2026 · Basis: contract · Estimate AI data center NAND demand surge | Audit 2026-10-24: TrendForce / DRAMeXchange publish NAND and SSD contract levels to subscribers only and their public releases give percentage changes, so this level cannot be checked against the publisher it was credited to; served as our unverified estimate. The previous attribution is kept in the corrections trail. | |||||||
| Q4 2024 | Enterprise SSD (TLC)Our model estimate | $0.13 | |||||
Source: Silicon Analysts estimate (unverified), Dec 2024 · Basis: contract · Estimate Supply shifting to enterprise; consumer shortage developing | Audit 2026-10-24: TrendForce / DRAMeXchange publish NAND and SSD contract levels to subscribers only and their public releases give percentage changes, so this level cannot be checked against the publisher it was credited to; served as our unverified estimate. The previous attribution is kept in the corrections trail. | |||||||
| Q4 2024 | Consumer SSD (TLC)Our model estimate | $0.07 | |||||
Source: Silicon Analysts estimate (unverified), Dec 2024 · Basis: contract · Estimate Supply redirected to enterprise; consumer prices rising | Audit 2026-10-24: TrendForce / DRAMeXchange publish NAND and SSD contract levels to subscribers only and their public releases give percentage changes, so this level cannot be checked against the publisher it was credited to; served as our unverified estimate. The previous attribution is kept in the corrections trail. | |||||||
| Q2 2023 | Consumer SSD (TLC)Our model estimate | $0.04 | |||||
Source: Silicon Analysts estimate (unverified), Jun 2023 · Basis: contract · Estimate Absolute price floor; consumer SSDs at near-cost | Audit 2026-10-24: TrendForce / DRAMeXchange publish NAND and SSD contract levels to subscribers only and their public releases give percentage changes, so this level cannot be checked against the publisher it was credited to; served as our unverified estimate. The previous attribution is kept in the corrections trail. | |||||||
| Enterprise SSD (TLC): 5 earlier prints, Q1 2022–Q2 2024 — full ledger is Pro | |||||||
| Consumer SSD (TLC): 1 earlier print, Q4 2022 — full ledger is Pro | |||||||
| Showing the newest 3 observations per series (Q2 2023–Q1 2026); 6 earlier observations (Q1 2022–Q2 2024) are in Pro. | |||||||
Provenance
Publisher NAND/SSD contract levels are subscriber-only; public TrendForce releases give quarter-on-quarter percentage changes. Every level here is labelled 'Silicon Analysts estimate (unverified)'.
Basis: contract
Contract price per GB by product class. The wafer-level spot series is a separate basis — see the per-series override.
Our derivations
- Silicon Analysts estimate (unverified) (Mar 2022)
- Silicon Analysts estimate (unverified) (Dec 2022)
- Silicon Analysts estimate (unverified) (Jun 2023)
- Silicon Analysts estimate (unverified) (Dec 2023)
- Silicon Analysts estimate (unverified) (Jun 2024)
- Silicon Analysts estimate (unverified) (Dec 2024)
- Silicon Analysts estimate (unverified) (Jan 2026)
- Silicon Analysts estimate (unverified) (Mar 2026)
Suggested citation
Silicon Analysts, "NAND Flash Pricing", as of Mar 2026, https://siliconanalysts.com/market-data/nand-flash-pricing, retrieved November 10, 2026.
Showing the newest 3 observations per series (Q2 2023–Q1 2026); 6 earlier observations (Q1 2022–Q2 2024) are in Pro.
Related Tools
Related Analysis
Market intelligence on this data
All market intelligence →TSMC Weighs 20% CoWoS Price Hike as Packaging Capacity Tightens
CoWoS packaging quote: up to +20%; equipment lead time: 3-6 months → up to 8 months; Blackwell test time 3-4x Hopper, Rubin up to 7x; SK hynix LTAs cover >50% of 2027-2028 capacity across 14 customers
NVIDIA Locks In 2.5x Substrate and 4x Interposer Capacity With Six Suppliers
Package substrate capacity: +150% (2.5x) over three years; interposer wafer capacity: +300%+ by end-2028; CPO optical engine capacity: 15x by mid-2027, 2x again by end-2028; test capacity: 2x from 2026 to 2027; Samsung Electro-Mechanics FC-BGA supply to NVIDIA growing at double-digit annual rates from 2026
Samsung to Use TSMC 3nm for Base Dies of Nvidia Custom HBM
N/A (no unit pricing disclosed); TSMC 2026 CapEx maintained at $60–64B, new Tainan 3nm fab production 1H 2028, Arizona Fab 2 mass production Q3 2027
Micron Opens Second Taiwan HBM Packaging Fab; All 2027 Output Already Sold Out
Capacity: new AATT2 HBM assembly/test line activated, with 100% of planned 2027 output contracted; Micron HBM capacity cited at ~60,000 wafers/month, roughly one-third of SK Hynix or Samsung