Technical Kickoff Meeting Agenda

Foundry-Customer Technical Kickoff Meeting

Meeting Preparation & Agenda Template

  • Fill in the project details, participants, and customize agenda timings/topics as needed.
  • Use the checkboxes below to track pre-meeting requirements.
  • Hover over terms like this for context.
  • Use the Logs at the end to capture action items, decisions, and issues during the meeting.
  • Click “Save as PDF” to generate a final agenda or minutes document.

Project Name: [PROJECT NAME]

Process Technology: [PROCESS NODE]

Date: [MEETING DATE] | Time: [START TIME][END TIME]

Location: [PHYSICAL LOCATION / VIRTUAL MEETING LINK]

PRE-MEETING PREPARATION

MEETING PARTICIPANTS

Foundry Team:

[NAME]
[NAME]
[NAME]
[NAME]
[NAME]
[NAME]
[NAME]

Customer Team:

[NAME]
[NAME]
[NAME]
[NAME]
[NAME]
[NAME]
[NAME]
[NAME]

AGENDA ITEMS

  1. INTRODUCTIONS (15 minutes)

    • Welcome and meeting objectives
    • Introduction of key team members and roles
    • Overview of communication channels and protocols
  2. PROJECT OVERVIEW (30 minutes)

    Customer presentation:
    • Product vision and market application
    • Chip architecture overview
    • Key functional blocks
    • Critical performance requirements
    • Preliminary floorplan (if available)
    • Technology selection rationale
    • Q&A
  3. PROCESS TECHNOLOGY OVERVIEW (45 minutes)

    Foundry presentation:
    • Process technology features and advantages
    • Key performance parameters
    • Process maturity status and manufacturing capabilities
    • Proven product examples (as applicable)
    • Known challenges and limitations
    • Available process options and variants
    • Process qualification status
    • Q&A
  4. PDK AND DESIGN ENABLEMENT (60 minutes)

    • PDK components and versions
    • Design rule overview and key constraints
    • Device models and characterization status
    • Standard cell libraries and IP availability
    • Memory compilers and other design automation tools
    • I/O and specialty components
    • Reference flows for different EDA platforms
    • DFM (Design for Manufacturing) guidelines
    • PDK update schedule and notification process
    • Known issues and workarounds
    • Design support resources and escalation paths
  5. BREAK (15 minutes)

  6. DESIGN METHODOLOGY ALIGNMENT (45 minutes)

    Customer design flow presentation
    • EDA tools and versions
    • Design methodology alignment
    • Library qualification status
    • IP integration approach
    • Verification strategy overview
    • DFT (Design for Test) approach
    • Design handoff requirements and formats (e.g., GDSII)
    • Engineering change order (ECO) process
  7. MANUFACTURING CONSIDERATIONS (30 minutes)

    • Wafer fabrication flow
    • Critical process steps
    • Process control monitoring
    • Test chip recommendations
    • MPW (Multi-project wafer) options
    • Prototype manufacturing options
    • Volume manufacturing capabilities
    • Yield optimization strategies
    • Package and assembly options
    • Known manufacturing risks
  8. QUALITY AND RELIABILITY (30 minutes)

    • Foundry quality management system (QMS)
    • Reliability qualification status
    • Failure analysis capabilities
    • Statistical process control methods
    • Qualification requirements for new products
    • Reliability monitoring programs
    • Product certification support
    • Quality documentation requirements
  9. PROJECT PLANNING AND TIMELINE (45 minutes)

    • Major project milestones
    • Design reviews (architecture, circuit, layout)
    • Preliminary schedule for:
      • Design completion
      • Tape-out
      • Mask preparation
      • Wafer fabrication
      • Wafer sort
      • Assembly and test
      • Qualification
      • Production ramp
    • Critical path identification
    • Risk assessment and mitigation strategies
    • Schedule dependencies and constraints
  10. SUPPORT MODEL AND NEXT STEPS (30 minutes)

    • Technical support structure and contacts
    • Regular meeting schedule and format
    • Documentation and knowledge base access
    • Issue tracking system
    • Design review process and schedule
    • Training needs assessment
    • Immediate action items
    • Next meeting objectives and date

ACTION ITEMS, DECISIONS, AND ISSUES

ACTION ITEMS AND FOLLOW-UP

No.Action ItemOwnerDue DateStatus
1
2
3
4
5

DECISIONS LOG

No.DecisionDateDecision Maker(s)
1
2
3

TECHNICAL ISSUES LOG

No.Issue DescriptionImpactOwnerResolution PlanTarget Date
1
2
3

MEETING MINUTES

[To be completed during/after the meeting]

APPENDIX A: REFERENCE DOCUMENTS

Document NameVersionLocation/LinkDescription
Process Technology Datasheet
PDK Release Notes
Design Rule Manual
Standard Cell Library Documentation
I/O Cell Documentation
DFM Guidelines
Project Specification
Block Diagram
Test Strategy

APPENDIX B: GLOSSARY OF TERMS

PDK
Process Design Kit
DRC
Design Rule Check
LVS
Layout Versus Schematic
MPW
Multi-Project Wafer
DFT
Design For Test
DFM
Design For Manufacturing
IP
Intellectual Property
ESD
Electrostatic Discharge
EDA
Electronic Design Automation

APPENDIX C: CONTACT INFORMATION

Foundry Contacts:

Technical Support:
Email: [TECH_SUPPORT_EMAIL]
Phone: [TECH_SUPPORT_PHONE]
Hours: [SUPPORT_HOURS]

PDK Support:
Email: [PDK_SUPPORT_EMAIL]
Phone: [PDK_SUPPORT_PHONE]

Account Management:
Name: [ACCOUNT_MANAGER]
Email: [ACCOUNT_MANAGER_EMAIL]
Phone: [ACCOUNT_MANAGER_PHONE]

Escalation Path:
Level 1: [NAME], [TITLE], [CONTACT]
Level 2: [NAME], [TITLE], [CONTACT]
Level 3: [NAME], [TITLE], [CONTACT]

Customer Contacts:

Project Manager:
Name: [PROJECT_MANAGER]
Email: [PROJECT_MANAGER_EMAIL]
Phone: [PROJECT_MANAGER_PHONE]

Technical Lead:
Name: [TECHNICAL_LEAD]
Email: [TECHNICAL_LEAD_EMAIL]
Phone: [TECHNICAL_LEAD_PHONE]

Executive Sponsor:
Name: [EXECUTIVE_SPONSOR]
Email: [EXECUTIVE_SPONSOR_EMAIL]
Phone: [EXECUTIVE_SPONSOR_PHONE]

DISTRIBUTION LIST

[List names and emails…]

This template provides a starting point. Customize the agenda based on specific project needs.
Ensure clear communication and capture outputs effectively.

“`